Kitchen Work
Full Kitchen Remodel in Fort Collins
Everything out, everything new: cabinets, counters, appliances, floor, lighting, and the wiring behind them.
A full kitchen remodel strips the room back to framing and rebuilds it. New cabinet layout, new plumbing and electrical rough-in, new counters, new appliances, new floor, new lighting. It is the version of the project that fixes the things a cosmetic update cannot: an undersized panel, a sink that sits in the wrong corner, a doorway that puts the fridge in a traffic lane. In Fort Collins, most full kitchen remodels land somewhere between $48,000 and $105,000, and the spread is driven far more by cabinetry and appliances than by labor. Build time is usually seven to twelve weeks on site once materials are staged, plus the lead time on the cabinets themselves, which is the part homeowners consistently underestimate.
What the scope covers
- Demolition back to framing, with cabinets and appliances hauled off
- Plumbing rough-in for a relocated sink, dishwasher, or pot filler
- Electrical rough-in: small-appliance branch circuits, dedicated appliance circuits, GFCI and AFCI protection to current code
- Cabinet layout drawn to NKBA clearances, then ordered and installed
- Countertop template, fabrication, and install with sink cutouts
- Range hood ducted to the outside, sized to the cooking appliance
- Flooring, backsplash tile, paint, and trim
- Permit pulled and inspections scheduled by the contractor as standard scope
Setting your expectation before the quote arrives
The figures above describe what this scope costs around Fort Collins when the work is permitted and run by a licensed contractor. Work through the cost calculator to set a number in your own head first, and read the Fort Collins kitchen remodel guide for how the local build sequence and the permit process run.
Questions about full remodel
How long is the kitchen out of service for a full remodel?
What drives the price difference between a $50,000 kitchen and a $100,000 one?
Can we live in the house during the work?
Do we need to pick everything before the job starts?
From the Notebook
More reading on full remodel
The Best Time of Year for a Fort Collins Kitchen Remodel
Snow, holiday timing, and contractor scheduling cycles all shape when to start a Northern Colorado kitchen remodel. Here is how the seasons really play out.
Why the Cabinet Order Sets Your Kitchen Start Date
Cabinet lead time, not crew availability, decides when a Fort Collins kitchen remodel can start, and how stock, semi-custom, and custom timelines compare.
What Dry Colorado Air Does to Your Kitchen Cabinets
Fort Collins winters run low on indoor humidity, and wood cabinetry moves with it. What to specify, seal, and acclimate to protect a Northern Colorado kitchen.
Other Scopes
Where else the budget could go
Most kitchens come down to one decision: change the surfaces, or change the room. Reading the neighbouring scope is usually what settles which one you are buying.
Kitchen Cabinet Replacement
New boxes in the same footprint, the fastest way to change how a kitchen works without moving plumbing
Countertop Replacement
New quartz, granite, or solid surface on existing cabinets, usually finished within a month of template
Open Concept Kitchen Conversion
Taking out the wall between kitchen and living space, with the beam, the permit, and the inspection that go with it
Small and Galley Kitchen Remodel
Getting real storage and real counter space out of a compact kitchen, without pretending it is bigger than it is
Start your kitchen with a free quote
Call (970) 305-3265 or use the quote form. A local kitchen remodeler comes out, measures, and puts a price in writing.