Skip to content

Reference

Kitchen remodel questions, answered plainly

The questions that come up before a first quote, grouped so you can find the one you have. If yours is not here, call (970) 305-3265 and ask.

Cost, timing, and how it works

What does a kitchen remodel cost in Fort Collins?

Between roughly $22,000 and $118,000 for a rebuild, depending on the size of the room and the level of the cabinets and appliances. A galley or condo kitchen at a stock level starts near $22,000. A standard 100 to 180 square foot kitchen with semi-custom cabinetry and quartz counters sits around $52,000 to $78,000. A large kitchen with shop-built cabinetry and professional appliances passes $100,000. A cosmetic refresh that keeps the boxes runs $6,000 to $20,000.

Why is the range so wide?

Because cabinetry and appliances are catalogue purchases with enormous spread, and both are the largest lines on the quote. The same room can take stock boxes or custom shop cabinetry, and the difference between those two decisions can exceed the entire cost of the flooring, the backsplash, and the lighting combined. Labor and trades vary far less.

How long does the whole thing take?

Seven to twelve weeks on site for a full remodel, two to four weeks for a cabinet replacement, one to three weeks for a refresh, and one day plus a two to three week fabrication wait for countertops alone. Add cabinet lead time before any of it starts, commonly six to ten weeks for semi-custom lines.

What sets the start date?

Cabinet lead time, almost always. Crews are easier to schedule than cabinets are to deliver, and the lead time clock starts when the final drawing is approved rather than when you first walk into a showroom. A change after approval restarts part of it. The timeline guide works through how to back-calculate a realistic finish date.

Does a kitchen remodel need a permit?

Anything touching plumbing, electrical, or structure does, which covers essentially every kitchen project past painting the doors. The contractor pulls the permit and books the inspections as part of standard scope. Which building department has jurisdiction depends on the address, which matters here because several towns in this area straddle the Larimer and Weld county line.

Can we live in the house during the work?

Almost everyone does. The kitchen itself is out of service, so a temporary kitchen goes somewhere else in the house with the refrigerator, a microwave, and a sink you can reach. The work zone is sealed with plastic and run under negative pressure during demolition. Expect noise from early morning and a dumpster in the driveway for part of the job.

What is a normal payment schedule?

Residential remodels are commonly staged: a deposit at contract, a payment at cabinet order because that money leaves the contractor immediately, further payments at defined milestones such as rough-in inspection and cabinet install, and a final portion held until the punch list is cleared. The exact milestones vary between contractors and belong in the written agreement.

What warranty is typical?

Workmanship warranties on remodeling work in this market commonly run one to two years, in writing. Separately, manufacturer warranties on cabinetry, countertops, and appliances pass to the homeowner, and those vary from one year to lifetime depending on the product. The two are different things and a good quote distinguishes them.

What happens if something turns up behind the walls?

It gets documented, priced, and issued as a written change order before the work continues. Older houses hide plumbing stacks, undersized wiring, rotten subfloor under a dishwasher, and the occasional structural surprise. A quote that carries a stated contingency for this is a sign of experience rather than padding.

Which towns are covered?

Fort Collins first, then Loveland, Windsor, Timnath, Wellington, Greeley, Berthoud, Severance, Johnstown, and Laporte. Roughly forty-five minutes from Old Town. Beyond that the travel starts eating the schedule badly enough that the work is better served by someone closer.

Deciding the scope

Should we replace the cabinets or reface them?

Reface when the boxes are plywood, square, and laid out sensibly, and you want the kitchen to look different. Replace when the boxes are swollen furniture board, when the doors no longer sit square because the carcasses have racked, or when the layout itself is the problem. Refacing changes the face of a kitchen. It cannot change how the kitchen works.

Can we keep the countertops if we replace the cabinets?

Rarely with stone. Granite and quartz are bonded to the cabinet tops and cut for that exact run, and getting a slab off intact is a coin flip. Laminate can sometimes survive if the run is identical. Budget for new counters and treat a saved top as a bonus.

Is it worth moving the sink?

It depends entirely on what is under the floor. Over a crawlspace or a basement the drain is reachable from below and the cost is modest. On a slab it means saw-cutting concrete, trenching, and re-pouring, which is loud, dusty, and considerably more expensive. Find out which you have before deciding the layout.

How do we know if a wall is load bearing?

The direction of the joists above is the first clue, and anything under a bearing point from the roof or an upper floor is suspect. The reliable answer comes from opening the ceiling or reading the framing plan. Either way a structural engineer sizes the beam, because even a non-bearing wall may be carrying a duct trunk or a plumbing vent that has to go somewhere.

Flush beam or dropped beam?

A flush beam sits inside the floor system so the ceiling reads continuous, which costs more because the joists get cut and hung off the beam. A dropped beam hangs below the ceiling and is cheaper. Under an eight foot ceiling a dropped beam is noticeable. Under nine or ten feet it often reads as intentional. Decide early, because it changes the engineering.

Do we have room for an island?

Plan on at least 42 inches of clear aisle on any working side, measured to the face of appliances rather than the counter edge, because it is the open dishwasher door that decides whether the aisle works. A room narrower than about twelve feet usually cannot take an island without making the kitchen worse. A peninsula off an existing run gives much of the benefit without the clearance penalty.

Sink in the island or cooktop?

Sink, usually. It puts the cook facing the room and keeps the range against a wall where a hood can duct straight out. A cooktop in an island needs a hood coming down from the ceiling or rising out of the counter, and both cost more and move less air than a wall-mounted hood.

How much overhang can a stone counter take?

Roughly ten to twelve inches unsupported depending on thickness and material. Seating typically wants around fifteen inches of knee space at counter height, so anything past the unsupported limit needs corbels, a steel plate, or a supporting panel. A cracked overhang cannot be repaired invisibly, which is why this detail is worth confirming on the drawing.

Cabinets and countertops

Quartz or granite?

Quartz if you want a surface that never needs sealing and shrugs off wine and oil, and you are willing to use trivets, because the resin scorches under a hot pan. Granite if you set hot pans down without thinking, and you accept periodic sealing. Both survive decades of family use. Neither is objectively better.

Is quartzite the same as quartz?

No. Quartzite is a natural metamorphic stone, harder than granite, generally needing sealing and sitting at the top of the material budget. Engineered quartz is crushed stone in resin. Some slabs sold as quartzite are in fact softer stones that behave very differently in a kitchen, and a fabricator can identify what a given slab is.

Are plywood cabinet boxes worth the upgrade?

For the sink base and the dishwasher return, yes without hesitation. Furniture board is dimensionally stable and perfectly serviceable dry, but once water reaches a cut edge it swells and does not recover. That is why the cabinet under the sink is the first one to fail in every kitchen ever built. Across a whole kitchen the upgrade is a judgement call about budget.

Framed or frameless cabinets?

Frameless gives more usable volume for the same outside dimension, which compounds across a run and matters most in a small kitchen. Framed forgives an out-of-square wall, which is relevant in an older house, and most American semi-custom catalogues are deeper on the framed side. Both last decades when the box material is decent.

Does butcher block work in this climate?

It works, but it asks for maintenance. Indoor humidity through a Front Range winter runs very low, and wide solid-wood tops want to cup and check if they are not sealed on every face and looked after. Wood is at its best as an island top or a section of prep run beside a stone perimeter rather than as the whole surface around a sink.

Where should the countertop seams go?

At a sink or an inside corner, where they are least visible and least stressed, with the pattern booked across the joint on natural stone. Slabs are commonly around 120 to 130 inches long, so a longer run has to have one. Seam locations appear on the layout drawing, and that drawing is the last point at which they can change.

During the build

Why does the countertop wait until after the cabinets are installed?

Because the fabricator templates off the finished boxes. Walls are never straight and cabinet runs are never perfectly square, and a template captures the real geometry of the room, including the bow in the wall behind the range. Templating from drawings is how you get a quarter inch gap that has to be hidden with caulk. That is why the ten day to three week gap between cabinet install and counter install is unavoidable.

Do we have to choose everything before demolition?

Cabinets, counters, and appliances, yes. Those three set rough-in dimensions and carry the longest lead times. Backsplash tile, paint colour, and hardware can be settled during the build. A good schedule names the date each selection is due, which is what stops a kitchen stalling in week six.

What makes a kitchen go over budget?

Changing the layout after the cabinet drawing is approved, discovering something inside a wall, and making selections late. In that order. The first is under your control entirely, the second is what the contingency is for, and the third is a calendar problem rather than a money problem until it delays a crew.

Do we need to be home during the work?

Not usually, once access is arranged. Some days matter more than others: the pre-construction walkthrough, the day the cabinets land and get checked against the order, and the countertop template. Most other days run without you, and a crew that has to stop and ask questions is a crew that is not working.

Should we buy our own appliances?

Either way works, as long as the quote says which. Owner-supplied appliances need to be on site and unboxed before install day, with the model numbers given to the designer early because the cabinet openings are drawn around them. A refrigerator that is two inches wider than the drawing assumed is an expensive discovery.

How much should we hold back for surprises?

A contingency of ten to fifteen percent of the project value is a reasonable planning figure on an older house and can be lower on recent construction where nothing is hidden. It is not padding, it is the amount you would otherwise have to find in a hurry when a drain stack turns up in a wall that was coming out anyway.

Still deciding?

The cost calculator gives you a number to react to in under a minute. The Fort Collins kitchen guide is the long version of everything above, and the glossary covers the vocabulary a quote is written in. When you want a real price on a real room, send the details.

Start your kitchen with a free quote

Call (970) 305-3265 or use the quote form. A local kitchen remodeler comes out, measures, and puts a price in writing.